In progress
Tercam
Camaçari, Bahia
27,000 m²
About 27,000 m² across two warehouses. Fire protection and electrical.
The Praia do Forte warehouse is already handed over, with a 198-point addressable fire alarm system.
Electrical, plumbing and fire protection — delivered as one. Since 1996.
Electrical, plumbing and fire protection, run as a single operation — one team, one schedule, one handover.
01 Energy
From the medium-voltage substation to the last emergency light.
02 Flow
Cold and hot water, sanitary sewer, storm drainage and pumped supply.
03 Protection
Sprinklers, hydrants, fire pump rooms and addressable detection — commissioned and documented.
Handed over with as‑builts, data books and full documentation.
In progress
Camaçari, Bahia
27,000 m²
About 27,000 m² across two warehouses. Fire protection and electrical.
The Praia do Forte warehouse is already handed over, with a 198-point addressable fire alarm system.
In progress
Uberlândia, Minas Gerais
Electrical
A commercial complex: stores, services and parking.
In progress
Jacareí, São Paulo
61,000 m²
A built-to-suit logistics warehouse of about 61,000 m².
1996
The company is founded in Paraná. The first job: electrical work for the Copel branch in Morretes.
1999–2010
Walmart, Sam's Club and Carrefour, across Brazil. Electrical installations, substations and fire alarm, store by store.
2021
Logistics warehouse, Rio de Janeiro. Fire protection and fire alarm.
2023–24
Shopping center, Rio de Janeiro state. Plumbing. Opened in April 2024.
2024–25
Expansion of the TCP port terminal, Paraná. All three disciplines. A client since 2002.
2024–25
São Paulo. Participation in the electrical and plumbing work.
2026
Vitória, Espírito Santo. All three disciplines in about 30,000 m² — a building for 12,000 people. Opened in August 2026.
The same three disciplines, under the BNL Contractors name.